2 Feasibility Study Work Flow

The drafting of the Feasibility Study should follow a consistent chapter framework. An overall schematic for the ‘work flow’ in preparing the HCBRT Feasibility Study is shown below. Other sections within these Guidelines relate to this Work Flow.


Figure 3 Work Flow for Preparation of HCBRT Feasibility Study

Next page Page top