Annex 13 Check List for Evaluating HCBRT Feasibility Studies

This check list provides a summary of the main points to be presented in a Feasibility Study of a High-Capacity BRT Mass Transit project. The feasibility study should ensure that these points are fully addressed. Information should be fully quantified, i.e. with tables of costs, route lengths, build-up of fleet, etc. All route maps and functional design of busways, terminals and stations should be drawn to scale.

pdf file

Page top